Preparing  the Design for Fabrication

                both the Pad frame and the top level cell of your project are present.
     
                  Leave the  default value in rest of the fields.  Click on OK to complete the stream out process.
                       
                 A message pops up once the stream out has completed successfully. Check the PIPO.LOG file
                 in the run directory to see if there are no errors .